• Telephone: +31 184 606 600
  • info@vandervlist.com

Transport en installation simulator KLM

Van der Vlist recently completed the transport and installation of a brand new cabin trainer for the KLM Training Centre. The project started in Rotterdam Port where the cabin trainer arrived from the United Kingdom. With a length of 15m, a width of 6,25m and a height of 4,35m, this was a complex task for all involved.

Upon arrival, the cabin trainer was lifted by crane from the trailer and placed on a pontoon. Van der Vlist then utilized the river network, delivering by water to Oude-Meer, close to Schiphol. The cabin trainer was then transported by trailer to Schiphol. Van der Vlist then offloaded and installed inside the Training Centre.

Van der Vlist looks back on a spectacular and successful project, and wishes the KLM cabin personnel many years of safe training!

< Back to Latest News

<img src="/images/newsletter-sign-up-news.jpg"/>

© 2019. Van der Vlist. all rights reserved. Van der Vlist and the Van der Vlist logo are trademarks or registered trademarks of Van der Vlist.

Flickr and the Flickr logo are registered trademarks of Yahoo! Inc. Reproduced with permission of Yahoo! Inc. ©2011 Yahoo! Inc. Web Design Hull - redsky